Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Jul 28, 2022     45-7 Cabin Doors and Transparency Step 1-3 - (2 hours)       Category: Fuselage
After positioning the hinges on the canopy and inserting the bolts i positioned the door using the aluminum straps to keep in position and some duct tape.
after that i drilled the first two holes into the the door and positioned the bolts. continued to drill the other holes after opening the door.
The installation of the Airward reinforcement plate will happen later.
The "proud bottom angle" sits less proud and i am confident that i will adjust during the finishing. The top of the cabin looks really great and the finishing will smooth out the little irregularities and the little ondulazioni too.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.